+高级检索
山区大跨斜拉桥悬臂施工期风振响应实测
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


Field Measurement of Wind-induced Vibration Responses of a Large Cable-stayed Bridge during Construction Stages in Mountainous Terrain
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    针对湖南郴州赤石大桥施工期桥位风特性及风致振动响应进行了现场实测与分析.对观测期大风天气桥面高度及桥塔塔顶处平均风速、风向、风攻角及紊流度等风特性参数进行了分析,并对桥梁结构风致振动响应进行了分析.结果表明:当风从北侧吹时风攻角变化范围较大,而当风从南侧吹时风攻角变化范围较小;桥梁结构主梁双悬臂施工期在大风作用下风振响应主要表现为“整体侧弯”以及“整体竖摆”振动; 桥梁悬臂施工期结构自振频率实测值与有限元分析结果吻合较好.

    Abstract:

    Field measurement and analysis of wind characteristics and wind-induced vibration responses of Chishi Bridge during construction stages were carried out, where Chishi Bridge is a large-span cable-stayed bridge located in Chenzhou, Hunan, China. The wind characteristic parameters at deck level and pylon top during observation period were analyzed, including the mean wind speeds, wind directions, wind attack angles and turbulence intensities. The wind-induced vibration responses of the bridge were also examined. The results showed that the wind attack angles changed within a rather wide range when the wind blew from the north, while the wind attack angles varied within a narrow range when the wind came from the south. The bridge with double cantilevers during construction stages mainly vibrated in the lateral bending and vertical pendulum modes under strong winds. The measured values of the natural frequencies of the bridge under construction stage agreed well with the analysis results by FEM.

    参考文献
    相似文献
    引证文献
文章指标
  • PDF下载次数:
  • HTML阅读次数:
  • 摘要点击次数:
  • 引用次数:
引用本文

刘志文,丁冬,贾亚光,陈政清.山区大跨斜拉桥悬臂施工期风振响应实测[J].湖南大学学报:自然科学版,2017,44(1):16~22

复制
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-02-07
  • 出版日期:
作者稿件一经被我刊录用,如无特别声明,即视作同意授予我刊论文整体的全部复制传播的权利,包括但不限于复制权、发行权、信息网络传播权、广播权、表演权、翻译权、汇编权、改编权等著作使用权转让给我刊,我刊有权根据工作需要,允许合作的数据库、新媒体平台及其他数字平台进行数字传播和国际传播等。特此声明。
关闭