+高级检索
基于熵权法和VIKOR法的公共工程项目风险评价研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


Research on the Risk Appraisal of Public Project Based on Entropy Method and VIKOR Method
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    由于公共工程项目风险种类繁多且各个风险之间的关系错综复杂,对公共工程项目风险评价理论研究成为项目风险管理的核心之一.本文提出了基于熵权法及多准则妥协解排序法(VIKOR)的公共工程项目风险综合评价方法,通过实例分析表明,该方法能够综合决策者的偏好进行有效的风险评价,评价结果能为项目管理部门提供科学的决策依据.

    Abstract:

    Considering that the entropy method and the objective criterion compromise solution ranking (VIKOR) method have advantages in solving multi-criteria decision problems, this paper used the two methods to evaluate public works' project risk and to overcome the difficulty resulting from the fixed weight method and the diversity of the decision-making. By selecting six construction projects of Changsha invested by the government for sample analysis, the results have shown that this method for the evaluation of public project risks is feasible and effective.

    参考文献
    相似文献
    引证文献
文章指标
  • PDF下载次数:
  • HTML阅读次数:
  • 摘要点击次数:
  • 引用次数:
引用本文

胡芳,刘志华,李树丞.基于熵权法和VIKOR法的公共工程项目风险评价研究[J].湖南大学学报:自然科学版,2012,39(4):83~86

复制
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
作者稿件一经被我刊录用,如无特别声明,即视作同意授予我刊论文整体的全部复制传播的权利,包括但不限于复制权、发行权、信息网络传播权、广播权、表演权、翻译权、汇编权、改编权等著作使用权转让给我刊,我刊有权根据工作需要,允许合作的数据库、新媒体平台及其他数字平台进行数字传播和国际传播等。特此声明。
关闭