+高级检索
基于在线和人工检测的海绵道路效果模拟评价
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


Effect Simulation and Assessment of Sponge Road Based on Online Monitoring and Manual Sampling
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    针对当前海绵城市水质在线监测指标单一、结果不稳定和可靠性低的问题,采用人工取样检测水质,并结合流量监测和SWMM模型模拟的方法,开展某市海绵城市道路的建设效果评价. 结果表明,该海绵城市道路对径流总量控制、径流污染控制和排水防涝效果十分显著. 在典型平水年海绵城市道路对年径流总量控制率达到94.2%,径流污染削减率分别为88.5%(以SS计)、88.3%(以COD计)、86.7%(以TP计)和88.5%(以NH3-N计),对20年一遇暴雨径流峰值削减率达到75.2%. 研究结果可为海绵城市道路建设效果的定量化考核和评价提供参考.

    Abstract:

    The online monitoring of water quality still has the problems of a single indicator, unstable results, and low reliability. In this paper, the construction effectiveness evaluation of a sponge city road is conducted with water analysis in manual sampling, combined with the methods of flow monitoring and SWMM modeling. The result shows that the sponge road has significant effects on total runoff control, runoff pollution control, drainage, and water-logging prevention. In a typical year with average precipitation, the annual total-runoff-control rate of the sponge road reaches 94.2%. The runoff-pollution-reduction rates are 88.5% (calculated by SS), 88.3% (calculated by COD), 86.7% (calculated by TP), and 88.5% (calculated by NH3-N), respectively. And the peak-runoff-reduction rate of stormwater with a 20-year return period reaches 75.2%. This research provides a reference for the examination and assessment of the construction effectiveness of sponge roads.

    参考文献
    相似文献
    引证文献
文章指标
  • PDF下载次数:
  • HTML阅读次数:
  • 摘要点击次数:
  • 引用次数:
引用本文

余健 ?,邓芸 ,胡双 .基于在线和人工检测的海绵道路效果模拟评价[J].湖南大学学报:自然科学版,2023,(7):221~228

复制
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-07-31
  • 出版日期:
作者稿件一经被我刊录用,如无特别声明,即视作同意授予我刊论文整体的全部复制传播的权利,包括但不限于复制权、发行权、信息网络传播权、广播权、表演权、翻译权、汇编权、改编权等著作使用权转让给我刊,我刊有权根据工作需要,允许合作的数据库、新媒体平台及其他数字平台进行数字传播和国际传播等。特此声明。
关闭