LI Guo-qiang1,2, YANG Tao-chun2,3, LU Yong4, CHEN Su-wen1,2
(1. State Key Laboratory for Disaster Reduction in Civil Engineering, Tongji Univ,Shanghai200092, China; 2. School of Civil Engineering, Tongji Univ, Shanghai200092, China; 3. School of Civil Engineering and Architecture, Univ of Jinan, Jinan,Shandong250022, China; 4. School of Engineering, The Univ of Edinburgh, EdinburghEH9 3JL, UK)李国强,杨涛春,陆勇,陈素文.爆炸下钢柱破坏时间及残余承载力对钢框架连续倒塌的影响[J].湖南大学学报:自然科学版,2016,43(5):1~8
复制