JIANG Zaolong1,2,4,LIU Xiaojun1,JIN Bo2,ZHANG Zhijun3,LIU Zhengbo2,ZHAO Jiaqi2,LI Yuan2
(1. College of Civil Engineering,Xi an University of Architecture & Technology,Xian 710055,China; 2. College of Civil Engineering,Hunan University,Changsha 410082,China; 3. The Third Engineering Co Ltd of China Railway Seventh Group,Xian 710032,China; 4. Hunan Huda Construction Supervision Co Ltd,Changsha 410082,China)姜早龙,刘晓君,金波,张志军,刘正波,赵嘉祺,李园.强电、强磁场对钢箱梁跨越磁浮快线轨道 顶推落梁施工的影响[J].湖南大学学报:自然科学版,2019,46(11):164~171
复制