Abstract:Based on the evaluation of the various costs of the Small and Middle-Sized Power Transformers(SMSPT),Present Value Method of Costs is adopted to carryout economical analysis of the replacement plans for replacing SMSPTs of 73 standardwith SMSPTs of S_7 st