Abstract:To choose the steel tube number and the disposition form of long span Concrete-Filled steel Tube(CFST) arch bridges, two CFST arch bridges with a span of 400 m, a width of 27.5 m(one was four-tube arch rib and the other was six-tube arch rib), and the sam