+Advanced Search

Model-based Optimal Control Study in Six-tank Integrative Activated Sludge Process
Author:
Affiliation:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
    Abstract:

    Model-based optimal control study of the six-tank integrative activated sludge process was carried out, and two step running time control strategies based on the cycle running feature of six-tank process were proposed, i.e. Fix_time strategy and NO3_control strategy. The step running time of the former was fixed, while that of the latter was controlled by SNO3 and its variation rate detected by the on-line sensors in the anoxic tanks. There were 7 parameters in Fix_time strategy and 6 parameters in NO3_control strategy needed to be determined. The two strategies were analyzed in multi-objective optimization method considering effluent quality and energy consumption simultaneously. The results showed that NO3_control strategy was more adaptive than Fix_time strategy because it could meet the time-demand of denitrification, and therefore, NO3_control strategy had better effluent quality with lower energy consumption. This research indicates that NO3_control strategy can improve the performance of the six-tank integrative activated sludge process.

    Reference
    Related
    Cited by
Article Metrics
  • PDF:
  • HTML:
  • Abstract:
  • Cited by:
Get Citation
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 05,2015
  • Published: