+Advanced Search

Application of DEM Morphology Analysis in the Hilly Terrain Landscape Construction—Taking Zhuzhou City As an Example
Author:
Affiliation:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
    Abstract:

    The natural height slope and elevation of the topography were reconstructed with computer to do terrain construction experiment, objective analysis of the Zhuzhou landscape layout was conducted with the terrain construction simulation data, and a guide of practical significance in city construction under the background of city development was proposed.

    Reference
    Related
    Cited by
Article Metrics
  • PDF:
  • HTML:
  • Abstract:
  • Cited by:
Get Citation
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 05,2015
  • Published: