MA Wenhui1,YANG Chengyong1,PENG Hua1,BAI Yan1, CHENG Lin1,GAO Lihong2,LIU Zhiyang2
(1. School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China; 2. Beijing Subway Ltd,Beijing 100044,China) 在知网中查找 在百度中查找 在本站中查找
Affiliation:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
Abstract:
To investigate the settlement control measurement on the retaining wall embankment under the dual slurry shield tunnels underneath traversing construction,taking the retaining wall embankment in Beijing Capital Airport Express Line at Wangjing on Beijing-Shenyang passenger high-speed railway line as engineering background, in-situ settlement monitoring data and shield construction parameters were analyzed. Settlement regulations of the embankment were narrated. Experiences on real-time adjustment of shield construction parameters,comprehensive use of pre-grouting,supplementary grouting and secondary grouting were summarized. The measurement results show that the relationship among tunneling parameters,as well as slurry parameters,is close. A relatively high thrust force,slurry pressure,slurry unit weight and slurry viscosity are the key parameters that ensure the shield to traverse quickly and safely with small disturbance to the embankment. Synchronous grouting at a pressure is 0.15~0.2 MPa greater than the slurry pressure and with a volume about 2.5 times the theoretical value can fully fill the shield tail void. Ground pre-grouting effectively improves the soil and moderately raises the embankment. Ground supplementary grouting at a pressure of 1.2 MPa can timely restrain and even compensate the settlement of the embankment. Secondary grouting in tunnels at a pressure of 1.2 MPa and a speed of 100 L/min reduces the post-construction settlement of the embankment.